• Product Lines

Home / Cool Stuff / Furnace #1 Has Left the Building!

Furnace #1 Has Left the Building!

Followers of the ETTER Blog will remember the Aluminum Forge Furnaces we’ve been building. Furnace #1 was completed earlier this week, at which point riggers were called in to expertly (and deftly) pluck the 10,000 pound furnace out of the shop and load it on a flatbed for transport to its final destination.

Work on Furnace #2 continues. Look for more photos as it nears completion!

These furnaces are prime examples of ETTER’s Solutions Division, which draws on the collective knowledge acquired over the course of our nearly 75-year existence to solve the toughest problems for our customers.

Cerro Furnace Being Loaded