When a customer recently inquired about installing a Duplex version of ETTER Engineering’s popular E101-P natural gas booster package into a very tight space, our engineering and design team jumped into action. Whereas a traditional Duplex package would have the gas booster pumps mounted side-by-side, this installation called for a vertical design to be developed, stacking the two gas booster pumps on top of each other, with the enclosure containing the touch-screen controls mounted atop the pumps. Despite the extra engineering work, the project was still completed within our standard lead-time, leading to a very happy customer! Nice work, team! Contact Us